Fast Facts

Total steelwork mass fabricated: 3 900 tons

All steel was supplied by the DSE fabrication facility in Vanderbijlpark.

Supply and fabrication of structural steel for the Moses Mabhida Stadium in Durban

Project description:

Grinaker-LTA, through its DSE Division, fabricated the compression ring, columns supporting the compression ring and temporary support steelwork for the main arch of the stadium which has a planned maximum capacity of 70 000.

back to projects

 

Advertising

  Print Advertising Campaign
PDF format Eiffel Tower [PDF - 186KB]
    PDF format Golden Gate Bridge [PDF - 1.4MB]
    PDF format Empire State Building [PDF - 1.3MB]