Fast Facts

Kilometres of road:
Package C – 21km, Package F – 17,6km

New bridges:
Package C – 7 bridges, Package F – 1 bridge

Contract duration:
21 months

Total employment created:
Package C – 1 374 jobs, Package F – 550 jobs

Gauteng Freeway Improvement Project
(Joint venture with Moseme Road Construction and Boitshoko Road Surfacing and Civil Works)

Project description:

Upgrading of the roads and intersections to improve traffic flow as part of the overall Gauteng Freeway upgrades on the N1, Buccleuch to Brakfontein interchanges (Package C) and on the N3 from the Geldenhuys interchange to Buccleuch interchange (Package F).

back to projects

 

 

Advertising

  Print Advertising Campaign
PDF format Eiffel Tower [PDF - 186KB]
    PDF format Golden Gate Bridge [PDF - 1.4MB]
    PDF format Empire State Building [PDF - 1.3MB]